SCADA integration is critical for visibility and automation. Communication issues are among the most reported problems.
Connectivity Issues
Connectivity failures may prevent data exchange between SmartGrid™ controllers and SCADA servers.
Checklist:
Verify each PCU has a unique IP address.
Confirm required ports (502 for Modbus/TCP, 102 for IEC 61850) are open.
Check physical cabling and switch link LEDs.
Ensure SCADA drivers match firmware versions.
Data Accuracy Problems
If SCADA displays incorrect or unstable values:
Verify sensor calibration.
Confirm system clock sync to NTP server.
Review network latency.
Accurate timestamps are mandatory for ISO compliance. Always re-verify time sync after firmware updates or system restarts.