Commissioning Procedures
Interlingo

Step-by-Step Commissioning

  1. Pre-Commissioning Checks

    • Verify installation quality (mechanical and electrical).

    • Ensure initial configuration is complete.

  2. Power-Up Test

    • Confirm all LEDs indicate normal operation.

    • Check for error codes on the Config Tool.

  3. Functional Tests

    • Activate inputs and verify corresponding outputs.

    • Test communication with connected PLC or SCADA system.

  4. Load Test

    • Simulate operational loads to confirm stable performance.

  5. Safety Systems Verification

    • Test emergency stop signals and safety interlocks.

  6. Final Configuration Validation

    • Verify all settings and operational parameters are correct.

Commissioning Checklist (To Be Filled by Technician)

Item

Status (Pass/Fail)

Comments

Technician Initials

Date

Mechanical Installation Check





Electrical Wiring Verification





Power-On Status LEDs





Firmware Version Verified





Network Settings Configured





I/O Configuration Verified





Communication Protocols Tested





Functional Input/Output Test





Load Test Performed





Safety System Checks





Final Validation Completed





Tip: Keep the completed checklist as part of the installation documentation for audit and support purposes.